机读格式显示(MARC)
- 000 01569cam a2200409 a 4500
- 008 940620s1994 caua b 000 0 eng
- 040 __ |a DLC |c DLC |d DLC
- 050 00 |a V858 |b .U2 1994
- 082 00 |a 359.9/383/0973 |2 20
- 245 04 |a The U.S. submarine production base : |b an analysis of cost, schedule, and risk for selected force structures / |c John Birkler ... [et al.].
- 260 __ |a Santa Monica, CA : |b Rand, |c 1994.
- 300 __ |a xxvii, 203 p. : |b ill. ; |c 26 cm.
- 336 __ |a text |b txt |2 rdacontent
- 337 __ |a unmediated |b n |2 rdamedia
- 338 __ |a volume |b nc |2 rdacarrier
- 500 __ |a "Prepared for the Office of the Secretary of Defense, National Defense Research Institute."
- 504 __ |a Includes bibliographical references.
- 610 10 |a United States. |b Navy |x Submarine forces.
- 650 _0 |a Submarines (Ships) |z United States.
- 650 _0 |a Navy-yards and naval stations |x Economic aspects |z United States.
- 650 _0 |a Shipbuilding industry |z United States.
- 650 _0 |a Defense industries |z United States.
- 700 1_ |a Birkler, J. L., |d 1944-
- 710 2_ |a Rand Corporation.
- 710 1_ |a United States. |b Department of Defense. |b Office of the Secretary of Defense.
- 710 2_ |a National Defense Research Institute (U.S.)
- 740 0_ |a US submarine production base.
- 740 0_ |a United States submarine production base.